10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

The PE-CS exam has 85 questions and runs 8 hours 30 minutes.

These 10 free PE-CS questions are organized by exam domain, so you can see how each part of the Principles and Practice of Engineering - Control Systems blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Measurement

Question 1

An orifice flow installation is calibrated for 0-250 m³/h at 0-25 kPa differential pressure, with constant fluid density. During commissioning, an applied differential pressure of 10.24 kPa produces 14.24 mA and a transmitter display of 160 m³/h, but the distributed control system (DCS) displays 200 m³/h. Both displays read correctly at zero and full scale. What explains the discrepancy?

Show answer & explanation

Correct answer: C - Square-root extraction is occurring twice; make the DCS input linear.

Question 2

A closed-vessel level transmitter has its high-pressure side connected to the bottom tap and its low-pressure side connected to the vapor space through a filled wet leg. After maintenance, the indicated level is higher than the sight-glass level. Process density and actual level are unchanged, and the transmitter passes an applied-pressure calibration. Which maintenance change would produce this direction of error?

Show answer & explanation

Correct answer: D - Returning the low-side wet leg to service before it has been completely refilled.

Domain 2: Control Systems

Question 3

Steam-header pressure disturbances reach a heat exchanger faster than its outlet-temperature controller can respond. A well-tuned steam-flow loop is much faster than the temperature loop, and both use the same steam valve. Product outlet temperature must remain the controlled variable. Select the appropriate cascade connection.

Show answer & explanation

Correct answer: A - Let the temperature controller set the flow controller's setpoint; let the flow controller position the valve.

Question 4

A pressure override temporarily limits steam-valve opening through a low-signal selector. While the temperature controller is not selected, its requested output continues to rise. When the pressure constraint clears, the valve stays wide open even after temperature exceeds setpoint; it closes only after a prolonged recovery. Valve-position feedback confirms that the actuator follows the selected command. Which control modification targets this behavior?

Show answer & explanation

Correct answer: A - Feed the selected valve command back to the temperature controller for integral tracking.

Domain 3: Final Control Elements

Question 5

A hot-liquid control valve discharges a persistent liquid-vapor mixture. At the operating temperature, the liquid's vapor pressure is 3.0 bar absolute; inlet pressure is 8.0 bar absolute and downstream pressure is maintained at 1.8 bar absolute. Inspection finds erosion extending into the downstream pipe. The process pressures and temperature cannot be changed. Which proposal addresses the governing mechanism?

Show answer & explanation

Correct answer: D - Treat the service as flashing and select erosion-resistant geometry with adequate two-phase outlet capacity.

Question 6

Select the valve trim that can regulate at both operating points below. The service is water with specific gravity 1.0; flow is turbulent and unchoked, and piping correction factors are unity. Low load: 12 US gpm, with 36 psi across the valve. Peak load: 72 US gpm, with 9 psi across the valve. Each listed Cv range is the manufacturer's usable range over the permitted travel band. All trims meet the pressure, temperature, and material requirements.

Show answer & explanation

Correct answer: C - Trim C: usable Cv range 1.5-30

Domain 4: Signals, Transmission, and Networking

Question 7

A two-wire transmitter must operate throughout its 4-20 mA measurement range and deliver its configured 22 mA high-fault signal. The supply is nominally 24 VDC but can fall to 22.5 VDC. The transmitter requires at least 12.0 V at its terminals. A series interface drops 2.0 V, and the passive receiving input has a 250 Ω resistance. There are no other loads. Which is the largest listed total cable resistance, including both conductors, that satisfies the complete output requirement?

Show answer & explanation

Correct answer: B - 120 Ω

Question 8

An intrinsically safe transmitter and its proposed barrier are each certified for the required hazardous location, but their certificates require an entity-parameter compatibility check. The transmitter's maximum permitted input voltage Ui is 28 V; the barrier's certified maximum output voltage Uo is 30 V. Normal operation is at 24 V, and the commissioning current-loop test passes. All other entity and installation checks are satisfactory. What disposition is justified?

Show answer & explanation

Correct answer: A - Replace the barrier with a compatible lower-Uo unit and reverify the circuit.

Domain 5: Safety Instrumented Systems

Question 9

A layer of protection analysis evaluates vessel rupture initiated by a pressure transmitter failing low, at 0.08 events per year. An independent relief system is credited with a probability of failure on demand of 0.10. A proposed alarm/operator layer uses that same failed transmitter and claims a probability of failure on demand of 0.10. The tolerable rupture frequency is 4 × 10⁻⁵ per year, with no additional conditional factors. A new low-demand safety instrumented function (SIF) will be independent of the initiating failure and the relief system. What is its largest permissible average probability of failure on demand (PFDavg), and which safety integrity level (SIL) probability band contains that value?

Show answer & explanation

Correct answer: B - 0.005 - SIL 2 probability band

Question 10

During an authorized online test, an exothermic reactor's high-high-temperature trip input is bypassed and connected to a simulator. The test permit requires independent temperature monitoring and an available manual shutdown. The independent measurement now exceeds the trip setpoint and continues rising. The safety requirements specification calls for isolating reactant feed while maintaining cooling; the manual shutdown performs those actions and is unaffected by the test bypass. Restoring the automatic input would take several minutes. Which action takes priority?

Show answer & explanation

Correct answer: D - Initiate the available manual shutdown immediately, isolating reactant feed while maintaining cooling.

That's 10 of 1,030

The full bank has 1,020 more PE-CS questions with explanations.

Continue in the free practice test →